
I put in a new wall in the bathroom, ~12-13 inches away from the concrete. The finished wall needs to be 12" from the center of the toilet rough-in. Currently the new wall is 11.75" from that. Needless to say, I fucked up, and will now have to move that wall. That's going to be a pain in my ass.
I also put in the free-standing wall between the bar area and the water heater. The bar area looks a LOT smaller than I was picturing in my head. I think it'll be fine though. I put in an opening for a 36" door in that wall. I don't think it's going to open inward very well though, unless maybe I get a double-door-type thing, so that it really has 2 - 18" doors opening inward. Will just have to see.
Oh, I also finished the soffit along the exterior wall in the office. That sucked too, and it was the easiest of all the soffits I have to do. I also started on the soffit in the bathroom, just nailed in the runners for now though. I got my new computer in, so it's hard to focus on manual labor.
No comments:
Post a Comment