I'm several weeks into finishing the basement on my new house, and thought I'd start a build log. I've really only done about 1/2 of the stud walls so far, so I'm not too far into the process.
The above picture is a crude representation of the basement as it was when I moved in. The brown area in the middle are the stairs. The black areas in the bottom-left corner room are the HVAC and the water heater and associated pipes, etc. The dark gray areas all around are various obstacles, most of them are the ductwork or I-beams running across the ceiling; the small circles in the small room at the top are the bathroom rough-in pipes in the floor. The green areas at the bottom are the double doors and windows on the back of the house. The small blue rectangle in the top-left room is the main water shutoff valve for the house.
The plan is as follows: The top-left room will be the office. The top-middle area will be split into a bathroom and a storage closet. The bottom-middle room will be a wet bar, with a bit of storage next to the water heater. And the bottom-right room will be a home theater, with the screen on the rightmost wall. I'm going to put in a media cabinet in the corner of that room, attached to the stairs.
That's it for now, will update with some progress soon.
No comments:
Post a Comment