Monday, April 12, 2010

Long time,.. no see


Sorry for the long delay... the blog kind of fell by the wayside.

Since my last post a lot has been done: insulation, drywall, plaster, paint, doors, wall plates, vents, etc, etc. Still to be done: tile, carpet, trim, media shelving, move-in.

The pic above is the office. The ones below are the bar and theater room. And the tile is the basketweave pattern in the bathroom and what will be in the foyer.